Call (754) 221-6945 or email info@eprllc.net to schedule your inspection today.
South Florida’s humidity (75%+ average) and frequent storms create perfect mold conditions, Stachybotrys and Aspergillus thrive behind walls unseen. EPR uses FLIR thermal imaging and ATP surface testing for accuracy others miss.
Phase 1: Comprehensive Inspection & Moisture Mapping
Tools: FLIR E95 thermal cameras, Protimeter Surveymaster, boroscope. Process: Identify all moisture sources, roof leaks, plumbing, HVAC condensation. Map affected areas in 3D. Deliverable: Detailed scope report with photos, moisture readings, and lab-ready sampling plan.
Free visual inspections; lab fees only if sampling required.
Phase 2: Certified Laboratory Analysis
Accredited Labs: EMSL Analytical (AIHA-LAP). Testing: Air, surface, bulk, ERMI, mycotoxin panels. Turnaround: 24–48 hours rush. Why It Matters: 40% of “black mold” calls are non-toxic Cladosporium, lab confirmation prevents over-treatment.
Results determine containment level (Level I–IV per IICRC S520).
Phase 3: Full Containment & Negative Air Setup
Standard: IICRC S520 Level III minimum for >30 sq ft. Execution: 6-mil poly barriers with zipper doors, critical barriers on HVAC, HEPA-filtered negative air machines (4–6 ACH). Monitoring: Real-time particle counters + manometers.
Double-layer containment for hospital/HOA projects.
Phase 4: Safe Removal Using EPA-Approved Methods
No Bleach Myth: Bleach kills surface mold only, doesn’t penetrate porous materials. EPR Protocol: HEPA vacuum → soda blasting or dry-ice for non-porous → wire brushing + antimicrobial encapsulant on framing. Porous Materials: Remove drywall 12″ past visible growth, bag immediately. Case Study: A Hollywood attic with 600 sq ft Stachybotrys removed in 3 days, no airborne counts above outdoor baseline. (Mold Remediation)
All waste double-bagged and disposed as biohazard when required.
Phase 5: Structural Drying & Moisture Correction
Equipment: LGR dehumidifiers, injectidry systems, desiccant units. Goal: Return materials to <15% moisture content and RH <50%. Fix the Source: Plumbing repairs, roof tarping, vapor barriers, negative-grade correction.
Phase 6: Independent Post-Remediation Verification (PRV)
Third-Party Testing: Separate hygienist (CIH/CSP) performs final air + surface sampling. Clearance Criteria: Indoor spore counts ≤ outdoor + no elevated pathogenic species. Deliverable: Signed clearance certificate accepted by insurance, banks, HOAs.
Re-clean free if failure (has never happened).
Do you work with insurance?
Get Started with EPR
Protect your health and property with EPR’s proven 6-phase process. Visit EPR or follow on Facebook.
Conclusion
Contact (754) 221-6945 or info@eprllc.net to breathe easy again.
Published by Edwards Property Remediation. Last updated Jun 4, 2026. General information, not advice for a specific property: call (754) 221-6945 to talk about yours.
